Tread Lightly! 4x4 PSA BlueRibbon Coalition PSA California Association of 4 Wheel Drive Clubs
4x4Voice Home Access Issues Energy Corridor EIS Released

OutdoorWire Calendar

4x4Voice Talk

My Feb 2014 report is attached.  Topics covered include proposed CARB rules for ...
1 month ago 0 292
I have been asked for copies of my presentation from the Cal4Wheel 2014 Conventi...
1 month ago 0 317
Draft Recreation Report: The U.S. Army Corps of Engineers Sacramento District, i...
1 month ago 0 212
On December 13, 2013, Superior Court of California issued a tentative ruling on ...
3 months ago 0 863
“Still Standing: Wildland Fire and Resilience” Dear Sierra Cascades Dialog P...
5 months ago 0 786

Leave Your Comments

I have seen fantastic blogs and I have seen the other ones. This blog is pretty informative in many ...
Thanks for the information. Keep on writing.
John, great June report and thanks for working on all aspects of OHV advocacy!
NRC South June Report in Joomla Article
Additional information about the Greater Sage Grouse issue is available at:

Federal Registe...
The is one on the many monthly reports from the Cal4 NRC published on this site.
CA4WDC NRC South - Oct 2012 in Joomla Article

4x4Voice

Controversy Around the Sage Grouse
Wildlife
The Spotted Owl of decades past pretty much shut down logging and closed thousands of miles of trail...
Continue Reading...
Public Workshops on the Sierra, Sequoia, and Inyo NFs announced
Region 5
(Photo credit: Wikipedia) The Forest Service is hosting public workshops to offer information a...
Continue Reading...
Ocotillo Wells Public Workshops Scheduled
Ocotillo Wells SVRA
California State Parks will conduct two public workshops, December 28, 2013 and January 12, 2014, as...
Continue Reading...
Carnegie SVRA Preferred Concept Workshops Announced
Carnegie SVRA
California State Parks will host an open house to review the Carnegie SVRA General Plan draft prefer...
Continue Reading...




Energy Corridor EIS Released PDF Print E-mail
User Rating: / 0
PoorBest 
Wednesday, 26 November 2008 18:09

Agencies Publish Final Environmental Impact Statement On Energy Corridor Designation in the West

Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States.
 
The Department of the Interior’s Bureau of Land Management and the U.S. Departments of Energy, Agriculture, and Defense (the Agencies) prepared the Final PEIS as part of their work to implement Section 368 of the Energy Policy Act of 2005.  The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines, as well as electricity transmission and distribution facilities on Federal lands in the West to meet the region’s increasing energy demands while mitigating potential harmful effects to the environment.

“Up to now, Federal land management agencies have often designated energy corridors and rights-of-way when local projects were proposed,” said Assistant Secretary of the Interior C. Stephen Allred.  “Designating energy corridors using a PEIS allows the participating Agencies to mitigate environmental effects and reduce conflicts with other uses of Federal land.  The results of this work will speed the process of siting energy infrastructure on Federal lands in the West.”

The Energy Policy Act of 2005 directs the Secretaries of Agriculture, Defense, Energy, and the Interior to designate energy transport corridors for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities on Federal lands in Arizona, California, Colorado, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming.  The Act further directs that environmental reviews be completed for the designation of such corridors, and that the designated corridors are incorporated into the relevant agency land-use and resource management plans or equivalent plans.

Energy transport corridors are agency-preferred locations where pipelines and transmission lines may be sited and built in the future.  Having a network of corridors that could accommodate transportation systems for multiple energy types potentially minimizes the proliferation of energy utility rights-of-way on the Federal landscape.  Eighty-two percent of the corridors analyzed in the Final PEIS are located on BLM-managed lands, while 16 percent are on USDA Forest Service lands.  The remaining proposed corridor segments are on lands managed by Interior’s Bureau of Reclamation and National Park Service, or by the Department of Defense.  Individual projects proposed for these corridors would undergo further, project-specific environmental analysis before being granted permits or rights-of-way.

Corridors were sited using a four-step process that identified a number of important lands and resources to be avoided to the fullest extent possible.  The Agencies examined factors that constrain where a network of energy transport corridors could be located – including topographical, environmental, and regulatory constraints – as well as the overall suitability of particular lands to support development and operation of energy transport infrastructure.  In some cases, corridors intersect or approach sensitive lands or resources.  Most often these intersections follow existing infrastructure such as highways, transmission lines, or pipelines to avoid placing corridors in “greenfield” (undeveloped) locations.

The PEIS identifies a number of requirements that will help ensure that energy transport projects within Section 368 energy corridors are planned, implemented, and operated in a manner that protects and enhances environmental resources.  Prepared under provisions of the National Environmental Policy Act, the Final PEIS outlines the potential environmental effects of two alternatives developed, in part, by using comments received during a scoping period in Fall 2005, public responses to preliminary maps published in June 2006, and public comments on the draft PEIS during a 90-day comment period earlier this year. 

The Agencies worked closely with local Federal land managers as well as local government agencies to ensure that the proposed corridors were consistent with local land management responsibilities and resource constraints.  In preparing the Final PEIS, the Agencies reviewed and considered all of the comments received on the draft during the 90-day comment period, and made revisions to the PEIS and adjustments to the corridors as appropriate and applicable.  Aspects of the alternatives were clarified or expanded to provide additional information on the purpose and need for corridor designation, potential impacts to resources, locations of sensitive resources or areas, or other concerns.

To review the Final PEIS and related documents, including detailed maps, visit the project Website at http://corridoreis.anl.gov.  Review copies are also available at libraries and agency regional and field offices.  Notice of the availability of the Final PEIS will be published in the Federal Register on Friday, November 28, 2008.

###



Add this page to your favorite Social Bookmarking websites
Reddit! Del.icio.us! Google! Live! Facebook! Technorati! StumbleUpon! MySpace! LinkedIn! TwitThis Joomla Free PHP
  • No comments found
 
VALID CSS   |   VALID XHTML